Chapter 10 - Create/Edit
Schedule/Command/Calendar
79
Siemens Industry, Inc. 125-3584T
6. Double click the entries in the Value column to change the desired values.
NOTE: To add a schedule to multiple days of the week, click the Add Multiple button.
1. From within the Object Editor window, click the Exception Schedule button to open
the Edit Exception Calendar window.
2. Click the + sign at the bottom left of the window to add an Exception Schedule.