Siemens 125-3584T manual Modifying a Command ObjectNotReleased

Models: 125-3584T

1 177
Download 177 pages 38.63 Kb
Page 86
Image 86

Chapter 10 - Create/Edit

Schedule/Command/Calendar

Modifying a Command ObjectNotReleased

1.Click the Command icon from the Create/Edit bar (hover over the Schedule icon to view it).

The Object Editor window displays.

2.Click Select a Panel at the top of the left pane of the Object Editor window to display available panels.

3.Select the desired panel and the desired schedule object by clicking the panel name and then the schedule object name.

The Command Object Editor window displays the command object details.

4.Make the desired modifications to the existing schedule (Description, Actions). See the Create a Command Object section for more information.

5.Click Save.

The Save button will be grayed out once the modifications are complete.

86

 

Siemens Industry, Inc.

125-3584T

Page 86
Image 86
Siemens 125-3584T manual Modifying a Command ObjectNotReleased