Chapter 2

Installation

This chapter contains the following installation procedures for the

AT-CV5000 chassis:

ˆ“Reviewing Safety Precautions” on page 40

ˆ“Selecting a Site for the Chassis” on page 44

ˆ“Unpacking the Chassis” on page 45

ˆ“Installing the Power Cord Retaining Clip (AC Powered Chassis Only)” on page 46

ˆ“Installing the AT-CV5000 Chassis in a Rack” on page 48

ˆ“Grounding the AT-CV5000 Chassis” on page 50

ˆ“Installing a Converteon™ Line Card” on page 52

ˆ“Cabling a Converteon™ Line Card in an AT-CV5000 Chassis” on page 55

ˆ“Powering On an AC Powered Chassis” on page 60

ˆ“Powering On a DC Powered Chassis” on page 64

ˆ“Starting a Local Management Session” on page 67

ˆ“Starting a Remote Management Session” on page 70

39

Page 39
Image 39
Allied Telesis AT-CV5000 manual Installation