Allied Telesis AT-CV5000 manual Working with the AT-CV5M01 Management Card, Installing an

Models: AT-CV5000

1 114
Download 114 pages 22.95 Kb
Page 76
Image 76

Chapter 3: Working with Line Cards and other Modules

Working with the AT-CV5M01 Management Card

Installing an

AT-CV5M01

Management

Card

This section contains the following procedures:

ˆ“Installing an AT-CV5M01 Management Card,” next

ˆ“Resetting an AT-CV5M01 Management Card” on page 77

ˆ“Replacing an AT-CV5M01 Management Card” on page 78

This section describes how to install an AT-CV5M01 Management Card.

Note

The AT-CV5M01 Management Card is hot-swappable. You can install it without powering off the Converteon™ chassis.

Warning: Remove all metal jewelry, such as rings and watches, before installing or removing a line card from a powered-on chassis.  E26

Caution: Be sure to observe all standard electrostatic discharge (ESD) precautions, such as wearing an antistatic wrist strap, to avoid damaging the device. A line card can be damaged by static electricity.

To install an AT-CV5M01 Management Card, perform the following procedure:

1.Remove the AT-CV5M01 Management Card from its shipping package and store the package in a safe place.

Note

You must use the original package if you need to return the unit to Allied Telesis.

2.Select any line card slot in the AT-CV5000 chassis where you want to install the management card and remove the slot cover, if installed.

3.Align the back edge of the management card with the top and bottom alignment guides located inside the slot.

Note

Avoid touching the line card components.

76

Page 76
Image 76
Allied Telesis AT-CV5000 manual Working with the AT-CV5M01 Management Card, Installing an