About this Manual
Page
Contents
Safety ......................................................................1
Site Planning............................................................5
Page
Start-Up Procedure .................................................49
Appendix A : System Operation.............................. 67
Page
Safety
Overview
Cross-refe rence symbols used in this ma nual
Save these instructions
Safety symbols used in this manual
Warnings
Installation/Maintenance
Maintenance performed while the PDU is receiving input power
Total Power Off
DANGERRisk of Electric Shock!
Emergency Power Off (EPO)
EMI
Site Planning
Dimensions
Symmetra PX UPS
InfraStruXure PDU
Site Planning: Dimensions
Battery Enclosure
NetShelter VX Enclosure
Page
Space Considerations
Weight Considerations
Heat Output
Electrical Requirements and Specifications
Procedures requiring a licensed electrician
Electrical requirements
Cross Tie Output Circuit Breaker
Emergency Power Off (EPO)
PDU
Switch
UPS
Basic Installation Procedure
Page
Page
Too ls Re qu ir ed
Page
Installation Procedures
Exchange Side Panels
Page
Attach the PDU, UPS, and Battery Enclosure
Ensure that All Power is Off
How to ensure that all power is off
Page
Page
Connect AC Power and Control Wiring
Page
Installation Procedures: Connect AC Power and Control Wiring
Connect control wiring.
A jumper wire must be installed in position 13 and 14.
Connect DC Power Wiring
Cascade Battery Enclosures
Connect power cables from the Battery Enclosure to the Symmetra PX UPS
Battery Enclosure Symmetra PX UPS
Connect an Emergency Power Off Switch
Installation Procedures: Connect an Emergency Power Off Switch
34 InfraStruXure SystemInstallation and Start-Up
Connect an EPO switch to the user connection plate and test the switch
or 24V AC/DC
EPO
NO NC
24V AC or DC Power Supply
Page
Safety warnings
InfraStruXure SystemInstallation and Start-Up 37
Connect User Input Contacts and Relay Outputs to the User Connection Plate
How to connect contacts to the PDU monitoring unit
Install Shielding Troughs, Shielding Partitions, and Cable Ladders
Shielding Troughs and Shielding Partitions for overhead wiring along rows
Cable Ladders for overhead wiring across rows
Install InfraStruXure Rack-Mount Devices
Install the Rack Automatic Transfer Switches (ATS)
Install the Rack Power Distribution Units (PDU)
Install the InfraStruXure Manager and Hub (or Switch)
Install the Environmental Monitoring Unit or Environmental Management System
Route and Attach Overhead Wiring
Connect the sub-feed power cable conductors to a three-pole breaker on the PDU
G
N
Route and attach power cables to equipment racks
Page
Page
46 InfraStruXure SystemInstallation and Start-Up
Route Data Cables to the InfraStruXure Manager Hub (or Switch)
User Contacts
Smart Slot
+12V
Symmetra PX UPS
Route network cables to the InfraStruXure Manager Hub (or Switch)
Page
Start-Up Procedure
Safety warnings
Ensure that all power is off
Page
Apply power to the system
Page
Page
Verify UPS battery operation
Page
Verify proper voltage and phase rotation on the PDU
Page
Page
Page
Verify proper phasing: place the UPS into bypass operation
Page
Return from maintenance bypass operation
Power the PDU Distribution Circuit Breakers
Close Cross-Tie
Configure the InfraStruXure Manager
Page
Appendix A : System Operation
How to Transfer the UPS into Maintenance Bypass Operation
Page
Page
Page
Page
Page
How to Ensure Total Power Off
ABX
How to Apply Power to the System
ABX
Page
Page
Page
InfraStruXure SystemInstallation and Start-Up 79
Appendix B : Single-Line Diagrams
80kW PDU with System Bypass 208V, 480V, or 600V Input, Single-feed, with Transformer
Appendix B : Single-Line Diagrams
80 InfraStruXure SystemInstallation and Start-Up
Appendix B : Single-Line Diagrams
}
InfraStruXure SystemInstallation and Start-Up 81
80kW PDU with System Bypass 208V Input, Single-feed, without a Transformer
Page
Appendix C: Changes in This Manual