Start-Up Procedure: InfraStruXure System
InfraStruXure System—Installation and Start-Up 63
3. Open (turn OFF) the Q3 circuit breaker on the InfraStruXure PDU.
The UPS automatically returns from Static Bypass.
Power the PDU Distribution Circuit Breakers
1. Ensure that the Q2 circuit breaker on the PDU is closed (ON).
2. Close (turn ON) the PDU distribution panel circuit breakers.
Note
When Q2 is closed, the PDU distribution panel is energized.
Note
When the distribution panel circuit breakers are closed, the PDU power
cables and connected equipment are energized.