Tools Required

The following tools are required to perform the procedures in this manual. Additional tools may be required for components not covered in this manual.

Tool

Supplied?

13-mm socket wrench

No

17-mm socket wrench

No

T-20 screwdriver

No

Standard screwdriver

No

Level

No

Open-ended wrench (14 mm) for adjusting the leveling feet

Yes

Step ladder

No

Crimper

No

Volt-meter

No

Phase-rotation meter

No

InfraStruXure System—Installation and Start-Up

17

Page 27
Image 27
American Power Conversion InfraStruXureTM System manual Tools Required, Tool Supplied?