American Power Conversion InfraStruXureTM System manual Appendix a System Operation

Models: InfraStruXureTM System

1 100
Download 100 pages 51.56 Kb
Page 9
Image 9

Route Data Cables to the

InfraStruXure Manager Hub (or Switch) . . . . . . . . . . . . . . . . . . 46

Connect network cables to components

46

Route network cables to the

 

InfraStruXure Manager Hub (or Switch)

47

Start-Up Procedure

49

Safety warnings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49

Ensure that all power is off . . . . . . . . . . . . . . . . . . . . . . . . 49

Apply power to the system . . . . . . . . . . . . . . . . . . . . . . . . 51

Verify UPS battery operation . . . . . . . . . . . . . . . . . . . . . . . 54

Verify proper voltage and phase rotation on the PDU . . . . . . 56

Start the UPS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57

Verify proper phasing:

place the UPS into bypass operation . . . . . . . . . . . . . . . . . . 60 Return from maintenance bypass operation . . . . . . . . . . . . . 62 Power the PDU Distribution Circuit Breakers . . . . . . . . . . . . 63 Close Cross-Tie . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64

Configure the InfraStruXure Manager . . . . . . . . . . . . . . . . . . . 65

Appendix A : System Operation

67

How to Transfer the UPS into

 

Maintenance Bypass Operation

67

How to Return from

 

Maintenance Bypass Operation

70

How to Ensure Total Power Off

73

How to Apply Power to the System

75

Appendix B : Single-Line Diagrams

79

Appendix C: Changes in This Manual

83

InfraStruXure System—Installation and Start-Up

v

Page 9
Image 9
American Power Conversion InfraStruXureTM System manual Appendix a System Operation