How to Return from Maintenance Bypass Operation

Select Help from the top-level menu screen on the PDU display interface and select the second help topic, Returning from PDU Maintenance Bypass, or follow the

Note procedure below:

1. Close (turn ON) the Q1 circuit breaker on the PDU.

2. If applicable, set the PDU Q10 Bypass Input (B) switch to ON.

3. Set the XR Battery Enclosure DC Disconnect circuit breaker to ON.

70

InfraStruXure System—Installation and Start-Up

Page 80
Image 80
American Power Conversion InfraStruXureTM System manual How to Return from Maintenance Bypass Operation