American Power Conversion InfraStruXureTM System manual Appendix a System Operation

Models: InfraStruXureTM System

1 100
Download 100 pages 51.56 Kb
Page 84
Image 84

Appendix A : System Operation

3. Set the Battery Enclosure DC Disconnect circuit breaker to the OFF position.

4. Pull out all battery units in the Battery Enclosures to the red battery disconnect line.

5. Set the Main Input switch (A), and, if applicable, the Q10 Bypass Input switch (B), and Cross Tie Output circuit breaker (X) on the PDU to the OFF position.

6. Open (turn OFF) the Q1, Q2, and Q3 circuit breakers on the PDU.

7. Set the upstream main input, and, if applicable, the bypass input and cross tie utility circuit breaker to the OFF or Locked Out position.

A B X

74

InfraStruXure System—Installation and Start-Up

Page 84
Image 84
American Power Conversion InfraStruXureTM System manual Appendix a System Operation