The BYPASS LED illuminates and the following screens appear:
UPS has been
commanded to go into Bypass...
UPS load is in Bypass
Press any key...
The H3 LED above the Q3 circuit breaker illuminates, but do not operate the
cirucit breaker.
Note
2. Use a true RMS voltmeter to make sure that there is no difference in potential between L1 IN and L1 OUT, L2 IN and L2 OUT, and L3 IN and L3 OUT on the Q3 circuit breaker. The Q3 circuit breaker must be in the OFF position. The top side of Q3 will be utility voltage and the bottom side of Q3 will be the voltage from the UPS in static bypass. Voltage should be less than 2 volts.
Q3 is a 4-pole circuit breaker. Be sure to measure L1 to L1, L2 to L2, and L3 to L3. Note
InfraStruXure System—Installation and Start-Up
Confirm
Yes, UPS into Bypass No, Abort
d. On the next screen: select Yes, UPS into Bypass, and press the ENTER key.
Graceful Turn Off Start Runtime Cal Turn Load On
Confirmation Screen
c. Select UPS Into Bypass on the Control menu, and press the ENTER key.
Control Menu
UPS Into Bypass
Do Self Test Simulate Power Fail Graceful Reboot
Control Logging
Status Display
Setup Diags Accessories Help
Command the UPS into static bypass operation through the UPS display interface: a. Press the ESC key to open the top-level
menu.
b. Select Control on the top-level menu, and press the ENTER key.
1.
Verify proper phasing: place the UPS into bypass operation
60