Fuel %
Load %
In 208V out000V 60Hz Runtime: 1hr 2m
Top-Level Menu
Control Logging
Status Display
Setup Diags
Accessories Help
Control Menu
UPS Into Bypass Do Self Test Simulate Power Fail Graceful Reboot
Graceful Turn Off
Start Runtime Cal Turn Load On
Confirmation Screen
Confirm
Yes, UPS Load ON No, Abort
UPS has been
commanded to turn load power on...
Low/No AC input Start up on Batt?
Start Now
UPS has been
commanded to turn load power on...
Top-Level Status Screen

Start-Up Procedure: InfraStruXure System

Verify UPS battery operation

1. Read the messages displayed on the Symmetra PX UPS display interface: Note any alarms and verify that they are

appropriate for start-up conditions.

2. Command the UPS to apply power to the load: a. Press the ESC key to open the top-level

menu.

b. Select Control, and press the ENTER key.

c. Select Turn Load On/Off from the Control menu, and press the ENTER key.

d. On the next screen: select Yes, UPS Load ON, and press the ENTER key.

The interface will display the following screen:

The interface will display the following fault message:

e. Select Start up on Batt, and press the

ENTER key.

The interface will display the following screen:

54

InfraStruXure System—Installation and Start-Up

Page 64
Image 64
American Power Conversion InfraStruXureTM System manual Verify UPS battery operation