Manuals
/
American Power Conversion
/
Computer Equipment
/
Power Supply
American Power Conversion
InfraStruXureTM System
manual
Models:
InfraStruXureTM System
1
10
100
100
Download
100 pages
51.56 Kb
7
8
9
10
11
12
13
14
<
>
Specs
Install
Connect control wiring
Dimension
Problem Action
Battery Enclosure
Start-Up Procedure
Weight
How to
Safety
Page 10
Image 10
Page 9
Page 11
Page 10
Image 10
Page 9
Page 11
Contents
Installation and Start-Up
Page
Page
Page
About this Manual
Page
Contents
Installation Procedures
Appendix a System Operation
Page
Cross-reference symbols used in this manual
Safety symbols used in this manual
Overview
Installation/Maintenance
Maintenance performed while the PDU is receiving input power
Total Power Off
Emergency Power Off EPO
EMI
InfraStruXure PDU
Dimensions
Symmetra PX UPS
Battery Enclosure
NetShelter VX Enclosure
Rack Distribution Panel
Space Considerations
Weight Considerations
Component Maximum Weight
Heat Output
Symmetra PX UPS
Procedures requiring a licensed electrician
Electrical Requirements and Specifications
Electrical requirements
Cross Tie Output Circuit Breaker
Overview
Emergency Power Off EPO
Pduups
Basic Installation Procedure
Licensed electrician must connect utility power
Start the system
Tools Required
Tool Supplied?
InfraStruXure System-Installation and Start-Up
Installation Procedures
Level the PDU, UPS, RDP, NetShelter and Battery Enclosures
Exchange Side Panels
Connect Battery Enclosure communication cables
Attach the PDU, UPS, and Battery Enclosure
Ensure that All Power is Off
How to ensure that all power is off
Installation Procedures Ensure that All Power is Off
Connect Utility Conductors to the PDU
Connect AC Power and Control Wiring
Equipment
Connect control wiring
Jumper wire must be installed in position 13
Connect DC Power Wiring
Cascade Battery Enclosures
UPS
Battery Enclosure Symmetra PX UPS
Connect an Emergency Power Off Switch
EPO
Contact Closure-Normally Open
Problem Action
Safety warnings
ATS 0 ATS 1 ATS ATS EN
How to connect contacts to the PDU monitoring unit
Relay output specifications
InfraStruXure System-Installation and Start-Up
Cable Ladders for overhead wiring across rows
Install the Rack Power Distribution Units PDU
Install InfraStruXure Rack-Mount Devices
Install the Rack Automatic Transfer Switches ATS
Install the InfraStruXure Manager and Hub or Switch
Route and Attach Overhead Wiring
Route and attach power cables to equipment racks
Installation Procedures Route and Attach Overhead Wiring
Installation Procedures Route and Attach Overhead Wiring
Route Data Cables to the InfraStruXure Manager Hub or Switch
Connect network cables to components
Overhead routing
Page
Start-Up Procedure
Ensure that all power is off
Start-Up Procedure InfraStruXure System
Apply power to the system
Use two people to lift and install battery units
Start-Up Procedure InfraStruXure System
PowerView RM Rev 000 English Please wait
Verify UPS battery operation
UPS load is on Press any key
Verify proper voltage and phase rotation on the PDU
Start the UPS
PowerView RM Rev 000 English Please wait
Close turn on the Q2 circuit breaker on the PDU
Page
Start-Up Procedure InfraStruXure System
Page
Power the PDU Distribution Circuit Breakers
Close Cross-Tie
Configure the InfraStruXure Manager
Page
How to Transfer the UPS into Maintenance Bypass Operation
Appendix a System Operation
Appendix a System Operation
UPS is now in maintenance bypass operation
How to Return from Maintenance Bypass Operation
Confirm Yes, UPS Load on No, Abort
Confirm Yes, UPS into Bypass No, Abort
How to Ensure Total Power Off
Appendix a System Operation
How to Apply Power to the System
Fuel% Load% 208V out000V 60Hz Runtime 1hr 2m
Top-Level Status Screen
Appendix a System Operation
Appendix
Appendix B Single
Appendix B Single-Line Diagrams
Page
General changes
Changes by page number
Page
Index
InfraStruXure System-Installation and Start-Up
UPS
Page
Page
990-1467B
Top
Page
Image
Contents