Exchange Side Panels

Before installing the InfraStruXure PDU, Symmetra PX UPS, and Battery Enclosure, you will need to exchange side panels so that the adjacent panels will have matching holes for joining the enclosures together and for routing input and output wiring between them. The following side panels will need to be exchanged:

Adjacent side panels of a PDU and UPS

Adjacent side panels of a Battery Enclosure and a UPS

Adjacent side panels of two Battery Enclosures

To exchange side panels:

1. Detach the ground wires from the side panels that you will be exchanging.

20

InfraStruXure System—Installation and Start-Up

Page 30
Image 30
American Power Conversion InfraStruXureTM System manual Exchange Side Panels