American Power Conversion InfraStruXureTM System manual

Models: InfraStruXureTM System

1 100
Download 100 pages 51.56 Kb
Page 54
Image 54

Installation Procedures: Route and Attach Overhead Wiring

For dual-feed devices within a redundant system: attach a power cable from each PDU into two different Rack PDUs in the NetShelter VX Enclosure.

For single-feed devices within a redundant system with an Automatic Transfer Switch: connect a power cable to the Automatic Transfer Switch (A and B feeds) and connect the Automatic Transfer Switch power cord to a Rack PDU in the NetShelter VX Enclosure.

For dual-feed devices in a redundant system with an Automatic Transfer Switch: connect a power cable from each PDU to the Automatic Transfer Switch’s A and B feeds, and another power cable from one PDU to a Rack PDU, and the Automatic Transfer Switch’s power cord to a second Rack PDU in the NetShelter VX Enclosure.

Lay the cables neatly in the Shielding Trough to minimize cable build-up.

Note

44

InfraStruXure System—Installation and Start-Up

Page 54
Image 54
American Power Conversion InfraStruXureTM System manual Installation Procedures Route and Attach Overhead Wiring