American Power Conversion InfraStruXureTM System InfraStruXure System-Installation and Start-Up

Models: InfraStruXureTM System

1 100
Download 100 pages 51.56 Kb
Page 96
Image 96

Emergency Power Off (EPO), connect, 3031

exchange side panels, 1819

install InfraStruXure rack- mount devices, 37

install shielding troughs, shielding partitions, and cable ladders, 3536

level the PDU, UPS, RDP,

NetShelter, and battery enclosures, 17

route and attach overhead wiring, 3841

total power off, ensuring, 2122

L

L1 wire recommended size, 11 torque, 11

L2 wire recommended size, 11 torque, 11

L3 wire recommended size, 11 torque, 11

LEDs

H2, 5758, 64, 68

H3, 56, 58, 64, 68

M

main input switch, 22, 4647, 7071

electrical requirements, 11

maintenance, performed while the PDU is receiving input power, 2

N

N wire

recommended size, 11 torque, 11

NetShelter VX dimensions, 6 level the, 17

weight considerations, empty, 9 neutral bar, location of, 38 neutral wire, location of, 38

O

operation, 6374

maintenance bypass, returning from, 6668

maintenance bypass, transferring the UPS into, 6365

system, applying power to, 7174

total power off, ensuring, 6970

P

PDU monitoring unit, connecting contacts to, 34

PDU. See InfraStruXure PDU. power module

start-up,48

Q

Q1 circuit breaker, 22, 46, 6566, 7071

Q2 circuit breaker, 22, 46, 5759, 64, 68, 70, 74

Q3 circuit breaker, 22, 46, 56, 58, 64, 68, 70

R

Rack Automatic Transfer Switch

(ATS), installation of, 37

Rack Distribution Panel

dimensions, 7

level the, 17

Rack Power Distribution Units,

installation of, 37

RDP. See Rack Distribution Panel.

S

safety, 14

during start-up,45 electric shock risk, 3 Emergency Power Off (EPO)

warnings, 32 overview, 1

symbols used in this manual, 1 warnings, 24

shielding partitions installing, 36

shielding trough accessories, 35 installing, 35

side panels, exchanging, 1819 site planning, 516

basic installation procedure, 1315

cross tie output circuit breaker, 12

dimensions, 57 battery enclosure, 6 InfraStruXure PDU, 5 NetShelter VX, 6 power module, 5

Rack Distribution Panel, 7 shielding partitions, 5 shielding trough, 5 UPS, 5

electrical requirements and specifications, 11

heat output, 10 InfraStruXure PDU, 10 UPS, 10

space considerations, 8 tools required, 16 weight considerations, 9

battery enclosure, 9 InfraStruXure PDU, 9 NetShelter VX, 9 UPS, 9

start-up procedure, 4561

applying power to the system, 4749

configure the InfraStruXure Manager, 61

cross tie circuit breaker, close, 60

PDU distribution circuit breakers, apply power to, 59

placing the UPS into bypass operation, 5657

returning from maintenance bypass, 5859

start the UPS, 5355

verify proper voltage and phase rotation, 5253

verify UPS battery operation, 5052

86

InfraStruXure System—Installation and Start-Up

Page 96
Image 96
American Power Conversion InfraStruXureTM System manual InfraStruXure System-Installation and Start-Up