Emergency Power Off (EPO), connect, 30– 31
exchange side panels, 18– 19
install InfraStruXure rack- mount devices, 37
install shielding troughs, shielding partitions, and cable ladders, 35– 36
level the PDU, UPS, RDP,
NetShelter, and battery enclosures, 17
route and attach overhead wiring, 38– 41
total power off, ensuring, 21– 22
L
L1 wire recommended size, 11 torque, 11
L2 wire recommended size, 11 torque, 11
L3 wire recommended size, 11 torque, 11
LEDs
H2, 57– 58, 64, 68
H3, 56, 58, 64, 68
M
main input switch, 22, 46– 47, 70– 71
electrical requirements, 11
maintenance, performed while the PDU is receiving input power, 2
N
N wire
recommended size, 11 torque, 11
NetShelter VX dimensions, 6 level the, 17
weight considerations, empty, 9 neutral bar, location of, 38 neutral wire, location of, 38
O
operation, 63– 74
maintenance bypass, returning from, 66– 68
maintenance bypass, transferring the UPS into, 63– 65
system, applying power to, 71– 74
total power off, ensuring, 69– 70
P
PDU monitoring unit, connecting contacts to, 34
PDU. See InfraStruXure PDU. power module
Q
Q1 circuit breaker, 22, 46, 65– 66, 70– 71
Q2 circuit breaker, 22, 46, 57– 59, 64, 68, 70, 74
Q3 circuit breaker, 22, 46, 56, 58, 64, 68, 70
R
Rack Automatic Transfer Switch
(ATS), installation of, 37
Rack Distribution Panel
dimensions, 7
level the, 17
Rack Power Distribution Units,
installation of, 37
RDP. See Rack Distribution Panel.
S
safety, 1– 4
during
warnings, 32 overview, 1
symbols used in this manual, 1 warnings, 2– 4
shielding partitions installing, 36
shielding trough accessories, 35 installing, 35
side panels, exchanging, 18– 19 site planning, 5– 16
basic installation procedure, 13– 15
cross tie output circuit breaker, 12
dimensions, 5– 7 battery enclosure, 6 InfraStruXure PDU, 5 NetShelter VX, 6 power module, 5
Rack Distribution Panel, 7 shielding partitions, 5 shielding trough, 5 UPS, 5
electrical requirements and specifications, 11
heat output, 10 InfraStruXure PDU, 10 UPS, 10
space considerations, 8 tools required, 16 weight considerations, 9
battery enclosure, 9 InfraStruXure PDU, 9 NetShelter VX, 9 UPS, 9
applying power to the system, 47– 49
configure the InfraStruXure Manager, 61
cross tie circuit breaker, close, 60
PDU distribution circuit breakers, apply power to, 59
placing the UPS into bypass operation, 56– 57
returning from maintenance bypass, 58– 59
start the UPS, 53– 55
verify proper voltage and phase rotation, 52– 53
verify UPS battery operation, 50– 52
86 | InfraStruXure |