Attach the PDU, UPS, and Battery Enclosure

1.Move the PDU, Symmetra PX UPS, and Battery Enclosures into position, aligning the holes in the adjacent side panels.

2.Level the PDU, Symmetra PX UPS, and Battery Enclosure by using a level and adjusting the leveling feet on each enclosure.

3.Thread the chase nipple (part number: 820-0071) through the opening in the adjacent side panels of the enclosures. The following enclosures will need to be attached:

An adjacent PDU and UPS

An adjacent Battery Enclosure and UPS

Adjacent Battery Enclosures

4. Tighten the lock-nut and the bushing on the chase nipple.

22

InfraStruXure System—Installation and Start-Up

Page 32
Image 32
American Power Conversion InfraStruXureTM System manual Attach the PDU, UPS, and Battery Enclosure