American Power Conversion InfraStruXureTM System manual Appendix a System Operation

Models: InfraStruXureTM System

1 100
Download 100 pages 51.56 Kb
Page 88
Image 88

Appendix A : System Operation

9. To apply power to the PDU distribution panel, close (turn ON) the Q2 circuit breaker on the PDU.

10.To apply power to the PDU power cords and connected equipment, close (turn ON) the distribution panel circuit breakers.

11.If applicable, close (turn ON) the Cross Tie Output (X) circuit breaker.

78

InfraStruXure System—Installation and Start-Up

Page 88
Image 88
American Power Conversion InfraStruXureTM System manual Appendix a System Operation