Space Considerations

Study the figures below to determine your space requirements for installing the InfraStruXure PDU, Symmetra PX UPS, and Battery Enclosure. Consult your local codes and the NEC for additional requirements.

Ceiling Clearance 18in (457.2mm)

 

Minimum Rear Clearance

 

208V: 36in (914.4mm)

Minimum Front Clearance

480V: 42in (1066.8mm)

 

208V: 36in (914.4mm)

 

480V: 42in (1066.8mm)

 