Site Planning: Basic Installation Procedure

16.Start the system.

Only qualified, APC-trained personnel may perform a system start-up.

See page 45 for detailed instructions. 17. Configure the InfraStruXure Manager.

For instructions, see the manual included with your InfraStruXure Manager.

See also

16

InfraStruXure System—Installation and Start-Up

Page 26
Image 26
American Power Conversion InfraStruXureTM System manual Start the system