
c.Use three of the screws that you removed earlier to secure the bottom cover; then, use the fourth screw to secure the power supply.
14.If your system has
Note: Attach the SCSI ID label that comes with the conversion kit on the front of the bezel, just above where you removed the
Bezel
Figure 12. Removing the hot-swap drive bay filler panel from the bezel
15.If your system does not have USB support, install the USB bezel insert over the empty
a.Align the top of the USB bezel insert with the top of the
USB bezel insert
Figure 13. Installing the USB bezel insert
b.Rotate the bottom of the USB bezel insert toward the server; then, push until it snaps into place.