16.To install the new system bezel that comes with the conversion kit, align the tab on the back of the bezel with the tab opening on the left-front of the system; then, swing the bezel toward the system and press until it snaps into place.

Figure 14. Installing the new system bezel

17.Install the release-latch-bracket assemblies on the system.

a.Align the bracket marked with an L with the holes on the left side of the system; then, use two M3.5 screws to attach the bracket to the system.

Release-latch-bracket assembly

Figure 15. Installing the release-latch-bracket assemblies

b.Repeat this step to install the other release-latch-bracket assembly on the right side of the system.

50Hardware Maintenance Manual: xSeries 220

Page 58
Image 58
IBM XSERIES 220 manual Installing the new system bezel