5Maintenance and Inspection
5 Maintenance and Inspection
The maintenance and inspection procedures to be carried out to use the robot for a long time without trouble are described in this chapter. The types and replacement methods of consumable parts are also explained.
5.1 Maintenance and inspection interval
Maintenance and inspection are divided into the inspections carried out daily, and the periodic inspections carry out at set intervals. Always carry these out to prevent unforeseen trouble, to maintain the product for a long time, and to secure safety.
(1) Inspection schedule
In addition to the monthly inspection, add the following inspection items every three months (estimated at 500 Hr operation hours).
0 Hr
5 0 0 Hr
1 0 0 0 Hr
1 5 0 0 Hr
2 0 0 0 Hr
Daily inspection
|
|
|
|
|
Monthly inspection |
|
|
|
|
|
|
|
|
|
Monthly inspection |
|
|
|
|
|
|
|
|
|
Monthly inspection |
|
|
| |
|
|
|
|
|
Monthly inspection |
|
|
|
|
|
|
|
|
|
Monthly inspection |
|
|
|
|
|
|
|
|
|
Monthly inspection |
|
| ||
|
|
|
|
|
Monthly inspection |
|
|
|
|
|
|
|
|
|
Monthly inspection |
|
|
|
|
|
|
|
|
|
Monthly inspection |
|
|
| |
|
|
|
|
|
Monthly inspection |
|
|
|
|
|
|
|
|
|
Monthly inspection |
|
|
|
|
|
|
|
|
|
Monthly inspection | Yearly inspection |
| ||
|
|
|
|
|
6 0 0 0 Hr
Monthly inspection | Yearly inspection | |||
|
|
|
|
|
Operating time
<Guideline for inspection period> For one shift
8 Hr/day × 20 days/month × 3 months = approx. 500 Hr 10 Hr/day × 20 days/month × 3 months = approx. 600 Hr
For two shifts
15 Hr/day × 20 days/month × 3 months = approx. 1000 Hr
[Caution] When using two lines, the
Fig.5-1 : Inspection schedule
Maintenance and inspection interval