Orbit Manufacturing 2000 manual Transporting of the machine

Models: 2000

1 139
Download 139 pages 46.42 Kb
Page 55
Image 55

Installation

Orbit™ 2000 Operation and Maintenance Manual

 

 

4.4 Transporting of the machine

The machine is shipped from the factory bolted to a wooden shipping pallet/ frame.

Note the position of the machine on the pallet/ frame as illustrated to the right.

Moving the machine on the pallet/ frame can only be accomplished with a lift truck or a pallet wagon.

The forks of the lift truck/ pallet wagon must be long enough to reach past the transport supports on the farthest side from the lift truck/ pallet wagon.

To remove the machine from the pallet/ frame:

– remove the shipping bolts

– drive the lift truck/ pallet wagon between the pallet/ frame and the machine frame

– slowly raise the machine from the pallet/ frame

Replace the shipping angle irons with the leveling feet before final placement.

The shift of the machine from the frame to the floor is shown on the picture.