Orbit™ 2000 Operation and Maintenance Manual | Table of Contents |
|
|
Section 4: Installation
4.0 | Installation precautions | 4 | - 1 |
4.1 | 4 | - 2 | |
4.2 | Suggested floor layout | 4 | - 4 |
4.3 | Shipping damage inspection | 4 | - 5 |
4.4 | Transporting of the machine | 4 | - 6 |
4.5 | Electrical installation | 4 | - 7 |
4.6 | Becker T4.25 DSK compressor installation | 4 | - 8 |
4.7 | Initial inspection | 4 | - 9 |
Section 5: Operations
5.0 | Operations | 5 | - | 1 |
5.1 | General information | 5 | - | 2 |
| 5.1.1 Main and secondary operator position | 5 - 2 |
© GBC Films Group January 2001 | Page III |