Operations

Orbit™ 2000 Operation and Maintenance Manual

 

 

8/ Tighten the 8 mm screws on both conical cones and tighten the nut ( g ) on the drive side conical cone ( h ) to secure the roll of film to the spool arbor ( c ).

g

h

c

9/ Use the lateral film adjust nut ( a ) to fine tune the positioning of the spool arbor with respect to the pile stack and use the unwind brake nut ( i ) to apply tension to film roll on shaft.

i a

Page 5 - 26

© GBC Films Group January 2001

Page 87
Image 87
Orbit Manufacturing manual Operations Orbit 2000 Operation and Maintenance Manual