Installation | Orbit™ 2000 Operation and Maintenance Manual |
|
|
4.1 Pre-installation checklist
The installation of the machine, the
Prior to the machine installation it is necessary to provide:
–an even floor of 2500 kg/ sq. meter minimal load factor ( 36.165 lb/ sq.ft ).
–a connection to air pressure of 0.6 Mpa @ 113L/ min. ( 90 PSI @ 4 CFM ) for the pneumatic circuit.
–a fused dicconnect
–a connection of 3 phase with ground, 400/ 230VAC+/- 10 %, 50 Hz, 30 amps ( EU Version ) for the electrical circuit.
–a connection of 3 phase with ground 230VAC +/- 10 %, 60Hz, 30 amps ( US Version ) for the electrical circuit.
Becker Compressor
The Becker compressor supplies air to the feeding assembly, and is connected by means of a plug to the machine.
Machine position
The machine must be placed so that
–space of at least 40 cm (1.3 ft) is available between the stacking table and the wall or any other fixed object
–space of at least 80 cm (2.6 ft) is available on the drive side between the covers and the wall or any other fixed object (another machine, etc.)