Orbit™ 2000 Operation and Maintenance Manual

Operations

 

 

6/

7/

Adjust air blowing tubes ( k ) by turning the nut ( l ) so that 10 - 20 sheets at the top of the stack are feathered.

l

k

Regulator ( m ) sets up the stack height.

m

© GBC Films Group January 2001

Page 5 - 13

Page 74
Image 74
Orbit Manufacturing manual Orbit 2000 Operation and Maintenance Manual Operations