Orbit™ 2000 Operation and Maintenance Manual

Operations

 

 

5/ Position the roll of film on the spool arbor ( c ) with respect to the adhesive side (Poly-in or Poly-

out). Refer to Section 6 Applications.

c

f

6/

7/

Replace the control side conical cone ( f ) on the operator’s side and leave the 8 mm screw

loose for movemt.

Measure from operators side/ side frame to paper pile left margin ( a ). Always add 1/8 in.

( 3.17 mm ) to this measurement. Use the measurement just obtained, with the 1/8 in ( 3.17 mm ) addition, to measure the edge of the film ( b ) on the spool arbor to the operators side/ side frame.

X+ 1 0 m m X + 3 /8 in .

b

 

X

a

5 m m

© GBC Films Group January 2001

Page 5 - 25

Page 86
Image 86
Orbit Manufacturing 2000 manual + 1 0 m m X + 3 /8