3 Diagnostic Programs 3.9 Communication
52 TECRA S1Maintenance Manual
Connect Timeout: Define the time that slave connecting to master (in seconds);
Test Timeout: Define the time that testing each transfer rate(in seconds);
SIR Test: Choose the transfer rates to be checked in Slow IR;
FIR Test: Choose the transfer rates to be checked in Fast IR.
Below are the operation steps:
Prepare a Master whose IrDA works normally, then run the test item in
‘Comm/IrMaster’ under Diagnostics menu; The master stays here to wait
for slave requesting.
Prepare a slave. User should choose the test item ‘Comm/IrSlave’ and set
parameters.
Below is the Slave Testing window.