AMX CV7 manual Installation of an NXD Touch Panel, Installing the NXD panel within a Rough-In Box

Models: CV7

1 220
Download 220 pages 3.02 Kb
Page 47
Image 47

Installation

1.Rest the right Stud Mounting tabs onto the stud (keeping the knockouts on the left). Be sure to leave enough of a gap between the stud and NXD Mounting tabs to accommodate the installation of the drywall or sheetrock after the rough-in box has been mounted. Ultimately, the Mounting Tabs should lie flush against the outside of the sheetrock.

2.Fasten the CB-TP7 rough-in box to the stud through the holes on the right Stud Mounting tabs (FIG. 36), using either nails or screws.

Stud Mounting tabs

Stud

Wiring knockouts (must be located on left side)

Drywall or sheetrock

FIG. 36 CB-TP7 rough-in box components

NXD Mounting tabs (should lie flush against the outside of the wall)

3.Remove the wiring knockouts from the left side of the rough-in box (CB-TP7) (FIG. 36) to accommodate the cables being threaded through to the NXD touch panel.

Remember that when mounting this rough-in box, the NXD mounting tabs must lie flush against the outside of the sheetrock.

4.Thread the incoming power, RJ-45 audio/video, Ethernet, and USB wiring through the knockouts (use of the left wiring knockouts are recommended with this installation).

Leave enough slack in the wiring to accommodate any re-positioning of the panel.

5.Install the drywall/sheetrock before inserting the main NXD unit into the CB-TP7.

Installation of an NXD Touch Panel

The NXD-CV7 can be installed either directly into the (optional) CB-TP7 or other solid surface environment using the two different mounting options: drywall clips or solid surface screws. The following sections describe mounting the touch panel directly into a pre-wall rough-in box, a solid surface or drywall, and optional NXA-RK7 Rack Mount Kit.

Installing the NXD panel within a Rough-In Box

The rough-in box must be mounted prior to continuing this section. Refer to the procedures in the Pre-Wall Installation of the Rough-In Box section on page 36 for detailed pre-wall installation instructions. Verify that all necessary cables have been threaded through the knockouts on the left of the rough-in box and the connections have been tested prior to installation of the NXD-CV7.

7" Modero Widescreen Touch Panels

37

 

 

Page 47
Image 47
AMX CV7 manual Installation of an NXD Touch Panel, Installing the NXD panel within a Rough-In Box