FOFFm4F
QQQ_¢_Q¬
A-4 ¤Fs¤mFsnnn
DEFINITY ECS Release 7 — Installation and Test for Single-Carrier Cabinets,
555-230-894, Issue 4
Provides procedures and information for hardware installation and initial testing
of single-carrier cabinets. This book is available in the following languages:
English, German (DE), Dutch (NL), Brazilian Portuguese (PTB), European
French (FR), Latin Spanish (SPL), Italian (IT), Russian (RU), and Japanese (JA).
To order, append the language suffix to the document number; for example,
555-230-894DE for German. No suffix is needed for the English version.
DEFINITY ECS Release 7 — Installation and Test for Multi-Carrier Cabinets,
555-230-112, Issue 6
Provides procedures and information for hardware installation and initial testing
of multi-carrier cabinets.
DEFINITY ECS Release 7 — Installation for Adjuncts and Peripherals,
555-230-125, Issue 5
Provides procedures and information for hardware installation and initial testing
of ECS adjunct and peripheral systems and equipment.
DEFINITY ECS Release 7 — Installation, Upgrades and Additions for
Compact Modular Cabinets, 555-230-128, Issue 4
Provides procedures and information for hardware installation and initial testing
of compact modular cabinets.
DEFINITY ECS Release 7 — ATM Installation, Upgrades, and Administration,
555-233-106, Issue 1
Provides step-by-step instructions for how to install, upgrade, and administer
ATM switches.
DEFINITY ECS Release 7 — Installation and Maintenance for Survivable
Remote EPN, 555-233-102, Issue 2
Describes how to install, cable, test, and perform maintenance on a Survivable
Remote Expansion Port Network (SREPN). Provides power, ground, and fiber
connections.