Chapter 2 Installation Setup

This chapter explains how to set up and install the Eaton 9170+ cabinets:

SSetup, including clearances and location requirements

SCaster cart installation (for 3- and 6-slot cabinets)

SStabilizer bracket installation (for 12-slot cabinets)

SRack-mount installation (for 3- and 6-slot cabinets)

SFloor anchor kit installation

SMoving the cabinets

Equipment Clearances

All cabinet sizes require the following clearances to allow for servicing and adequate ventilation:

SSides: 15.2 cm (6”)

STop and back: 30.5 cm (12”)

SFront: 91.5 cm (36”)

If flexible conduit connects the UPS to the service input and load distribution panels, you may be able to gain access for servicing by moving the UPS. If this is the case, you must still leave 30.5 cm (12”) clearance at the back and 15.2 cm (6”) at the sides of the UPS for ventilation.

NOTE Do not block the ventilation holes on each side and the back of the cabinet.

Nine- and 12-slot external battery cabinets may be installed with bases tight against the UPS cabinet base and against each other. Six-slot cabinets require 15.2 cm (6”) of separation.