
UPS STARTUP
NOTE All power modules in the Eaton 9170+ UPS cabinet must be of the same type:
NOTE Do NOT install more than seven power and/or optional battery charger modules in the system.
3.Insert the power modules into the upper slots of the cabinet. To insert a power module:
Lower the front slightly and lift the rear edge over the safety stop on the center support rail. Keep the module handle extended until the module is fully inserted (see Figure 48).
Raise the power module handle to secure the module into the cabinet. Be sure the handle latch snaps into place. Tighten the thumbscrew on the handle.
Figure 48. Inserting the Modules
4.If you installed an optional battery cabinet, repeat Steps 1 and 2 to install the battery modules.
5.Reinstall the front cover(s).
6.Continue to the following section, “Startup for
68 | Eaton 9170+ UPS |