BATTERY CABINET INSTALLATION

Entrance Panel

Battery Cable

Figure 42. UPS Power Entrance Panel

3.Use a pair of pliers to bend the narrow links (1 and 2 in Figure 43) between the outer edge of the lower breakaway panel and the rear panel.

4.Use the pliers to bend the entire breakaway panel (at 3 and 4 in Figure 43) until it breaks away.

1

4

 

2

3

Figure 43. Breakaway Panel Links

5.Verify all hazardous voltages have been removed from the backplane by testing with a voltmeter or other test device.

62

Eaton 9170+ UPS (3–18 kVA) User's Guide S 164201393 Rev E www.eaton.com/powerquality

Page 68
Image 68
Eaton Electrical ASY0673, ASY0529, ASY0567, ASY0674 manual UPS Power Entrance Panel