INSTALLATION SETUP

B

Floor Anchor

Bracket

A

Figure 11. Floor Anchor Brackets Bolted to UPS Cabinet

Moving the Cabinets

C A U T I O N

Do NOT attempt to raise the cabinet with the power or battery modules installed.

The Eaton 9170+ UPS and the battery cabinet are very heavy with power and battery modules installed. Before moving the cabinets, remove the power and battery modules. Move the modules separately from the cabinets.

The 3- and 6-slot cabinets may be ordered with a caster cart to enable moving the cabinet. “Caster Cart Installation (Three- and Six-Slot Cabinets)” on page 12 describes how to set the four foot pads on this cart to keep the cabinet from rolling when properly positioned.

The 9- and 12-slot cabinets have casters built into the cabinet base. To raise the cabinet before rolling it on its casters:

1.Verify that the cabinet contains no power or battery modules.

2.For 12-slot cabinets. Slide the cabinet base out from under the stabilizer brackets in the rear section of the cabinet base.

Remove the stabilizer brackets from the floor/wall. Follow the instructions in “Stabilizer Bracket Installation” on page 13 to reinstall the stabilizer brackets in the new location.

3.Locate the four plastic caps covering the caster bolts. They are at the corners of the cabinet base.

Eaton 9170+ UPS (3–18 kVA) User's Guide S 164201393 Rev E www.eaton.com/powerquality

17

Page 23
Image 23
Eaton Electrical ASY0674, ASY0673, ASY0529, ASY0567 manual Moving the Cabinets, Floor Anchor Brackets Bolted to UPS Cabinet