INSTALLATION SETUP
Eaton 9170+ UPS (3–18 kVA) User's Guide S 164201393 Rev E www.eaton.com/powerquality 15
3. Carefully replace the UPS cabinet top cover and secure with the
four screws removed in Step 1. Position the cover lip to fit behind
the front panel display.
4. Install three metal clip nuts onto each side flange (six clip nuts on
6-slot cabinets) along the front of the UPS cabinet (see Figure 9).
Tab Slots
Metal Clip Nuts
Figure 9. Metal Clip Nut and Tab Slot Locations
5. Install a rack-mount ear (two for 6-slot cabinets) on each side of the
UPS cabinet (see Figure 10).
Insert the two offset tabs on the rear edge of the ear into the
matching tab slots on the cabinet side frame (see Figure 9). Pivot
the ear forward until it is flush against the UPS cabinet side frame.
Using three 1/4-20 1/2 Phillips-head bolts, screw the bolts into
the metal clip nuts installed in Step 4.
Rack-Mount Ear
Figure 10. Rack-Mount Ear Installed