INSTALLATION SETUP

3.Carefully replace the UPS cabinet top cover and secure with the four screws removed in Step 1. Position the cover lip to fit behind the front panel display.

4.Install three metal clip nuts onto each side flange (six clip nuts on 6-slot cabinets) along the front of the UPS cabinet (see Figure 9).

Tab Slots

Metal Clip Nuts

Figure 9. Metal Clip Nut and Tab Slot Locations

5.Install a rack-mount ear (two for 6-slot cabinets) on each side of the UPS cabinet (see Figure 10).

Insert the two offset tabs on the rear edge of the ear into the matching tab slots on the cabinet side frame (see Figure 9). Pivot the ear forward until it is flush against the UPS cabinet side frame. Using three 1/4-20 1/2” Phillips-head bolts, screw the bolts into the metal clip nuts installed in Step 4.

Rack-Mount Ear

Figure 10. Rack-Mount Ear Installed

Eaton 9170+ UPS (3–18 kVA) User's Guide S 164201393 Rev E www.eaton.com/powerquality

15

Page 21
Image 21
Eaton Electrical ASY0529, ASY0673, ASY0567, ASY0674 manual Metal Clip Nut and Tab Slot Locations