Eaton Electrical ASY0567, ASY0673, ASY0529 Caster Cart Installation Three- and Six-Slot Cabinets

Models: ASY0673 ASY0529 ASY0674 ASY0567

1 124
Download 124 pages 26.4 Kb
Page 18
Image 18

INSTALLATION SETUP

5.If installing the 9- or 12-slot cabinet in a rack, follow the installation instructions with the 9- and 12-slot rack-mount kit.

6.If you are installing an external battery cabinet, continue to “Battery Cabinet Installation” on page 61.

If you do not have an external battery cabinet, continue to “UPS Startup” on page 67 for plug-receptacle units. For hardwired units, continue to “UPS with Bypass Electrical Installation” on page 19 or “UPS Electrical Installation” on page 39.

Caster Cart Installation (Three- and Six-Slot Cabinets)

An optional caster cart (ASY-0527) is available for 3- and 6-slot cabinets for increased mobility of the UPS (see Figure 7).

NOTE The UPS cabinet is heavy (see page 105). This procedure requires two people to lift and position the cabinet onto the caster cart. Lift the cabinet using four lifting straps shipped with the cabinet; do not attempt to lift the cabinet by the module shelves or other convenient edges or covers.

Caster Cart

Figure 7. Three-Slot Cabinet Being Lowered onto Caster Cart

12

Eaton 9170+ UPS (3–18 kVA) User's Guide S 164201393 Rev E www.eaton.com/powerquality

Page 18
Image 18
Eaton Electrical ASY0567, ASY0673, ASY0529, ASY0674 manual Caster Cart Installation Three- and Six-Slot Cabinets