Relocating the Library
10.From the front of the library, add the foam to the
Foam
(Back of library) | (Front of library) |
Foam
Figure 41: Adding the shipping foam inside the library
Relocating the Library
10.From the front of the library, add the foam to the
Foam
(Back of library) | (Front of library) |
Foam
Figure 41: Adding the shipping foam inside the library