RWD WHEELCHAIRS

SECTION 15

 

 

This Section Includes the Following:

Removing/Installing Group 24 Battery Box Sub-Frame

Removing/Installing 22NF Battery Box Tray

Converting 22NF Battery Box Tray to Group 24 Battery Box Sub-Frame Shock or Rubber Element Replacement

Shock Spring Replacement

Removing/Installing Gearbox

Adjusting Weight Distribution

Repositioning the Motor

Replacing Suspension Arm for Wheelchairs with Motor/Gearbox Assembly Replacing Suspension Arm for Wheelchairs with Gearless/Brushless Motor Anti-Tipper Wheel Replacement

Removing/Installing the 3-inch Anti-tip Assembly

WARNING

After ANY adjustments, repair or service and BEFORE use, make sure that all attaching hardware is tightened securely - otherwise injury or damage may result.

REMOVING/INSTALLING GROUP 24 BATTERY BOX SUB-FRAME (FIGURE 1)

REMOVING

1.Remove the battery boxes. Refer to REMOVINg/INSTALLING BATTERY BOXES in SECTION 9 of this manual.

2.Remove the two (2) mounting screws and locknuts that secure the wiring harness w/bracket and the sub-frame to the base frame.

3.Perform one (1) of the following:

A.WHEELCHAIRS EQUIPPED WITH VENT TRAY - Remove the four (4) mounting screws that secure the shocks, retainer bar, spacers and retainer clips to the base frame.

B.WHEELCHAIRS WITHOUT VENT TRAY - Remove the four (4) mounting screws that secure the shocks and spacers to the base frame.

4.Remove the existing sub-frame assembly.

INSTALLING

1.Install the two (2) mounting screws and locknuts that secure the wiring harness with bracket and the NEW sub-frame to the base frame. Use Loctite 242 and torque mounting screws to 160 in-lbs.

RWD WHEELCHAIRS

Part No. 1104849

119

3G Storm Series® Wheelchairs

Page 119
Image 119
Invacare Arrow RWD, Torque SP RWD REMOVING/INSTALLING Group 24 Battery BOX SUB-FRAME Figure, RWD Wheelchairs Section