1 Power supply retaining screws 2 Power supply assembly

7.If you are instructed to return the power supply, follow all packaging instructions, and use any packaging materials that are supplied to you for shipping.

Installing a power supply

To install a power supply, do the following:

Note: Approximately 1 to 3 minutes after the server is connected to ac power, the power-control button becomes active.

1.Align the screw holes in the power-supply-cage pivot bracket with the corresponding screw holes on the rear of the chassis.

82ThinkServer TD200 Types 3724, 3808, 3809, 3815, 3817, 3824, 3826, 3836: Installation and User Guide

Page 100
Image 100
Lenovo 3824, 3836, 3809, 3826, 3724, 3808, 3815, 3817 manual Installing a power supply