Chapter 8 Parallel System
Note
At this time, the input and output terminals of this failed UPS unit are still energized. Switch off the unit’s input and output circuit breakers if these terminals may be touched during maintenance.
2.After repairing the failed UPS, connect it to the parallel operation system again
After repairing the failed UPS, the procedures to connect it to the parallel operation system are given below:
1)If this UPS unit’s input and output circuit breakers have been switched off during maintenance, switch on them again;
2)Switch on this UPS unit’s Q1 and Q2;
3)Switch on this UPS unit’s battery switch QF1;
4)When this UPS unit’s rectifier starts (the rectifier indicator illuminates green), press the “inverter start” button to start the inverter. If the inverter can be start, then the UPS recovers to normal, otherwise switch off and isolate the UPS unit again and repair it;
5)After the inverter starts, switch on Q5,this UPS unit will operate together with other UPS units normally.
8.5.5Emergency shutdown
In parallel operation system, if only one UPS unit needs to be shut down, the user should press the “emergency shutdown” button on this UPS unit. If all the UPS units need to be shutdown, connect all the “emergency shutdown” dry contacts of the UPS units together and set up a “emergency shutdown” button for the whole system. But the UPS units should be repaired separately. The operation procedures are given in Chapter 6.
Method of setting up a “emergency shutdown” button for the whole system
A isolated