Chapter 5 Operation of Display Panel
12:30:20 | |||||
Inv. On | Units: |
| ID 1 | ||
Mains |
| A(B) | B(C) | C(A) | |
Bypass | Power |
|
| 221 | |
Out | Cap Transfer with Interupt 12.5 | ||||
Local | , Confirm |
| 50.1 | ||
System |
|
|
| .41 | |
Battery | Factor |
|
|
| |
Input Breaker Close | 11£ |
| |||
Byp. Breaker Close | 11£ |
| |||
Output Breaker Open11£ | OK | ||||
UPS in Normal Mode 11£ | |||||
| |||||
Batt. Boost Charging 11£ |
|
Fig. 5-40 Bypass to inverter prompt
From inverter to bypass mode with interruption:
If the bypass voltage or frequency exceeds the synchronized range and the UPS is in inverter mode, the system must let the user to confirm and accept the power interruption danger before pressing the inverter stop key to shutdown the output of the inverter. The user can also cancel the shutdown operation, as shown in Fig. 5-
41.If the bypass voltage restores to normal before the user makes the confirmation, the UPS will transfer to bypass operation mode automatically, and at the same time the prompt window will disappear soon.
12:30:20 | ||
Inv. On | Units: | ID 1 |
Mains | A(B) B(C) | C(A) |
Bypass | Power | 221 |
Out | Cap This operation leads | 12.5 |
| to output shutdown, | 50.1 |
Local | Confirm or cancel | |
System |
| .41 |
Battery | Factor |
|
Input Breaker Close 11£ 08- 12:09
Byp. Breaker Close 11£
Output Breaker Open11£ 08- 12:09
UPS in Normal Mode 11£ 08- 12:09
Batt. Boost Charging 11£ 08- 12:09
C
OK
Fig. 5-41 Transfer to bypass prompt
Overload due to shutdown: The parallel operation system is in inverter mode, if the load capacity exceeds the total capacity of the remained UPS units when shut down one UPS unit. The UPS that is to be shut down will display a prompt window to ask the user to confirm before shutting down, as shown in
64