Appendix D: Acceptance Test Procedures

ISGS Acceptance Test

Overvoltage (59) Function

Set the ISGS as follows:

 

Parameter Set A

7103

Voltage Primary Rating 120 V

1201

Connection Line to Neutral

1202

Enable Function

2201

Time Characteristic: Inverse Time

2202

Trip on Line to Neutral

2203

Pickup Level 100 V

2204

Time Dial per Table

2206

Trip Matrixed to Trip 1 Contact

6401

Phase

A B C Connections

1. Connect the appropriate source of control voltage to terminals 13 (+) and 12 (-).

Relay Disabled contact on terminals 19 and 20 opens.

2. Connect suitable variable voltage source to terminals 41, 43, and 45 with

neutral connected to 42, 44, and 46.

3. Connect a timer to the Trip 1 contacts on terminals 1 and 2.

Pickup

4. Apply nominal to neutral system voltage.

Pickup LED extinguishes.

Trip LED may be reset.

5. Slowly increase voltage until relay picks up.

Pickup LED illuminates.

Display shows PICKUP 59 P1 (2, 3).

Wisdom software records pickup in event log.

6. Return voltage to nominal value.

Pickup LED extinguishes.

Wisdom software records end of pickup.