Teledyne GFC 7001EM operation manual Initial Operation, Input Gas Venting, Exhaust Outlet

Models: GFC 7001E GFC 7001EM

1 321
Download 321 pages 4.48 Kb
Page 46
Image 46

Getting Started

Model GFC7001E Carbon Dioxide Analyzer

3.4.2.3.Input Gas Venting

The span gas, zero air supply and sample gas line MUST be vented in order to ensure that the gases input do not exceed the maximum inlet pressure of the analyzer as well as to prevent back diffusion and pressure effects. These vents should be:

At least 0.2m long;

No more than 2m long and;

Vented outside the shelter or immediate area surrounding the instrument.

3.4.2.4.Exhaust Outlet

Attach an exhaust line to the analyzer’s EXHAUST outlet fitting. The exhaust line should be:

PTEF tubing; minimum O.D ¼”;

A maximum of 10 meters long;

Vented outside the GFC 7001E/EM Analyzer’s enclosure.

NOTE

Once the appropriate pneumatic connections have been made, check all pneumatic fittings for leaks

using the procedures defined in Section 12.3.3.

NOTE

For information on attaching gas lines to GFC 7001E/EM Analyzers with various calibration valve

options,

see Section 5.6.

3.5.INITIAL OPERATION

NOTE

The analyzer’s cover must be installed to ensure that the temperatures of the GFC Wheel and absorption

cell assemblies are properly controlled.

If you are unfamiliar with the GFC 7001E/EM theory of operation, we recommend that you read Section Error! Reference source not found.. For information on navigating the analyzer’s software menus, see the menu trees described in Appendix A.1.

Teledyne Analytical Instruments

46

Page 46
Image 46
Teledyne GFC 7001EM operation manual Initial Operation, Input Gas Venting, Exhaust Outlet