4. PROCEDURE BEFORE DAILY OPERATION |
4.1 Installation of the Scale
4. PROCEDURE BEFORE DAILY OPERATION
4.1 Installation of the Scale
WARNING!
When installing the scale, avoid locations that have the following adverse conditions. Failure to do this may cause a fire, electric shock, or injury.
Direct sunlight, high temperature, high humidity, rapid temperature change, vibrations, dust, near a device generating magnetism or electromagnetic wave, near fire or moisture, unstable table.
CAUTION!
Basically, the power cord should come out from the left side of the scale being fitted into the ditch of the scale bottom. If it cannot, care must be taken when adjusting the adjustable legs so as not to squash the power cord.
Install the scale on the
As viewed from the top | As viewed from the right side |
50 mm | 50 mm |
| Ditch |
Platter
150 mm
Power Cord
NOTES:
1.Remove anything that touches or may touch the platter around the scale. Failure to do this may cause incorrect weighing operation.
2.Avoid the location where the scale is subject to the direct wind from the air conditioner. Failure to do this may cause incorrect weighing operation.
3.TOSHIBA TEC will not guarantee any problems with the scale and the peripheral devices caused by installation or removal of the peripherals by yourself.
4.2 Preparation
Before starting the business hours, perform the following preparatory operations.
1.Plug in the scale. (Refer to Section 5.)
2.Adjust the level of the scale. (Refer to Section 6.)
3.Turn ON the power switch. (Refer to Section 7.)
4.Adjust the angle of the operation panel. (Refer to Section 9.)
5.Load the media. (Refer to Section 8.)
After the business hour is over, clean the scale.
1.Turn OFF the power switch. (Refer to Section 7.)
2.Clean the scale. (Refer to Section 11.)
4- 1