Middleby Marshall PS500 VII. GAS Supply, Duringpressuretestingnoteoneofthefollowing

Page 11

SECTION 2 - INSTALLATION

Figure 2-13 - Utility Connection Locations for Gas Ovens

Electrical

Junction Box One per oven cavity

Strain-relief

fitting

Gas Inlet

One per Single, Double, Triple, or Quad Oven

ENGLISH

Figure 2-14 - Utility Connection Locations for Electric Ovens

2" (51mm) cutout for electrical supply

VII. GAS SUPPLY

CAUTION

3. If incoming pressure is over 14” W.C. (35mbar), a sepa-

DURINGPRESSURETESTINGNOTEONEOFTHEFOLLOWING:

rate regulator MUST be installed in the line BEFORE the

1. The oven and its individual shutoff valve must be discon-

individual shutoff valve for the oven.

WARNING: To prevent damage to the control valve regula-

nected from the gas supply piping system during any

pressure testing of that system at test pressure in excess

tor during initial turn- on of gas, it is very important to open

of 1/2 psi (3.45 kPa).

the manual shutoff valve very slowly.

2. The oven must be isolated from the gas supply piping

After the initial gas turn-on, the manual shutoff valve must

system by closing its individual manual shutoff valve dur-

remain open except during pressure testing as outlined in

ing any pressure testing of the gas supply piping system at

the above steps or when necessary during service main-

test pressure equal to or less than 1/2 psi (3.45 kPa).

tenance.

 

 

A.Gas Utility Rough-In Recommendations

The following gas system specifications are STRONGLY RECOMMENDED. Deviating from these recommendations may affect the baking performance of the oven.

Gas Meter

One or two oven cavities: 750 cfh meter

Three or four oven cavities: 1200 cfh meter

Gas Line

DEDICATED LINE from the gas meter to the oven

2-1/2" (63.5mm) pipe for natural gas

2" (50.8mm) pipe for propane

Maximum length: 200' (61m). Each 90° elbow equals 7' (2.13m) of pipe.

11

Image 11
Contents Owners Operating and Installation Manual English Table of Contents II. Oven Components see Figure DescriptionOven Uses Electrical specifications for PS555G and PS570G gas ovens InstallationQuantity Base PAD KIT see FigureRecommendations Installation KIT see FigureIII. Ventilation System RequirementsBase Pad, Legs, Casters, and Stacking IV. AssemblyRestraint Cable Installation Conveyor InstallationIncorrect Master link Position Pad Loosen conveyor collarDirection Travel Additional Information Electric Ovens Final AssemblyVI. Electrical Supply Additional Information Gas OvensVII. GAS Supply DuringpressuretestingnoteoneofthefollowingRate regulator Must be installed in the line Before Above steps or when necessary during service mainGas Conversion Conveyor Speed SwitchOperation Location and Description of ControlsII. Normal Operation STEP-BY-STEP DailystartupprocedureDailyshutdownprocedure III. Quick Reference Digital Temperature Controller Symptom Problem IV. Quick Reference TroubleshootingMaintenance Daily MaintenanceRemoving Air Fingers and Plates II. Maintenance MonthlyLocking collar III. Maintenance Every 3 MonthsSplit Belt Disassembly and Cleaning Lubricating the Blower Fan Bearings IV. Maintenance Every 6 MonthsBlower Belts Item Qty Description KEY Spare Parts KIT Available separately. See FigureGas Ovens Electric OvensThermocouples Wiring DiagramsElectricalwiringdiagrams 380V or 480V, 50/60Hz, 3 Ph Important diagram for the oven is alsoAn electrical wiring Located inside the machinery compartmentManuel Dinstallation ET DE Fonctionnement Avertissement Schémas DE Câblage Table DES MatièresFonctionnement EntretienFour unique Four double Four triple Four quadruple Utilisations DU FourII. Composants DU Four Figure Tableau 1-2 Spécifications généralesAssurez-vous que le système de ventilation est Vérifiez si lalimentation en gaz et la combustionQuantité Trousse DE Plaque DE Pose voir FigureExigences II. Trousse Dinstallation FigureRecommandations III. Système DE VentilationIV. Assemblage Maille extérieure PosePanneau LatéralRenseignements supplémentaires Fours électriques Assemblage FinalVI. Alimentation EN Électricité Renseignements supplémentaires Fours à gazDURANTLESSAIDEPRESSION,NOTEZCEQUISUIT VII. Alimentation EN GAZBrûleur à gaz Conversion du gazCoude de Tuyau à Gaz Flexible Dispositif de raccord OU de Débranchement RapideFonctionnement Emplacement ET Description DES CommandesBouton de commande « Heat » chaleur Attendez ProcéduredemiseenservicequotidienneII. Fonctionnement Normal PAS-À-PAS Procéduresquotidiennesdemiseenlarrêt« Actual Temp » IV. Consultation Rapide Résolution DE Problèmes Entretien Quotidien EntretienAvertissement RemarqueRangée du bas B1 B2 B3 B4 B5 B6 II. Entretien MensuelRemarque Collier de fixation III. Entretien TrimestrielDémontage et nettoyage dune bande divisée Vis Dajustement du TransporteurGraissage des paliers de ventilateur de soufflerie IV. Entretien SemestrielCourroies de soufflerie Art Qté Pièce N Description Fours à gazFours électriques Fours À Bande Divisée Seulement Schémas DE CâblageSchémas DE Câblage Toastmaster Manual DE Instalación Y Operación DEL Propietario Aviso Sección 3 Operación SECCIÓN5-DIAGRAMASDELCABLEADOELÉCTRICOÍndice Sección 2 InstalaciónTabla 1-2 Especificaciones generales SECCIÓN1-DESCRIPCIÓNUSO DEL Horno II. Componentes DEL Horno Ver FiguraSECCIÓN2-INSTALACIÓN Cantidad Juego DE Cojines DE Base ver FiguraItem Ctdad. Número de Pieza Descripción II. Juego DE Instalación ver FiguraIII. Sistema DE Ventilación Parte delantera del horno IV. EnsambladoDirección de MovimientoPosición Afloje el tornillo deRetén Información Adicional Hornos Eléctricos Ensamblado FinalVI. Suministro Eléctrico Información Adicional Hornos de GasDurantelaspruebasdepresiónobservelosiguiente VII. Suministro DE GAS PrecauciónConversión Según el Tipo de Gas Interruptor Heat Calor Permite que se Sección 3 OperaciónUbicación Y Descripción DE LOS Controles Procedimientodiariodeapagado II. Operaciones Normales Paso a PasoImportante ProcedimientodiariodeencendidoIII. Referencia Rápida Controlador Digital DE Temperatura IV. Referencia Rápida Diagnóstico DE Averías Síntoma Problema SoluciónMantenimiento Diario SECCIÓN4-MANTENIMIENTOAviso NotaFigura 4-3 Remoción de los dedos de aire y las placas II. Mantenimiento MensualCollar de seguridad III. Mantenimiento TrimestralNota IV. Mantenimiento SemestralCorreas de los Ventiladores Lubricación de los cojinetes de los ventiladoresItem Ctdad. No. de Pieza Descripción Hornos de gas Hornos eléctricosEléctrico Diagramas DEL CableadoSección 5 Diagramas DEL Cableado Eléctrico PageFRANÇAIS PáginaESPAÑOL Dentro del