Adjustments

Introduction

 

Introduction

 

This chapter describes adjustments and checks which ensure proper

 

performance of the power meter. Adjustments are not normally required

 

on any fixed periodic basis, and normally are performed only after a

 

performance test has indicated that some parameters are out of

 

specification. Performance tests should be completed after any repairs

 

that may have altered the characteristics of the power meter. The test

 

results will make it possible to determine if adjustments are required.

 

Allow 30 minutes for the power meter to warm up, and then remove the

 

cover, for access to the test and adjustment points.

 

To determine which performance tests and adjustments to perform after a

 

repair, see “Post-Repair Adjustments”, on page 3-3.

 

Safety Considerations

 

This warning must be followed for your protection and to avoid damage to

 

the equipment being used.

 

 

WARNING

Adjustments described in this chapter are performed with

 

power applied to the instrument and with protective

 

covers removed. Maintenance should be performed only by

 

trained personnel who are aware of the hazards involved.

 

When the maintenance procedure can be performed

 

without power, the power should be removed.

 

 

3-2

Agilent E4418B/E4419B Service Guide