Introduction
| Introduction |
| This chapter describes adjustments and checks which ensure proper |
| performance of the power meter. Adjustments are not normally required |
| on any fixed periodic basis, and normally are performed only after a |
| performance test has indicated that some parameters are out of |
| specification. Performance tests should be completed after any repairs |
| that may have altered the characteristics of the power meter. The test |
| results will make it possible to determine if adjustments are required. |
| Allow 30 minutes for the power meter to warm up, and then remove the |
| cover, for access to the test and adjustment points. |
| To determine which performance tests and adjustments to perform after a |
| repair, see |
| Safety Considerations |
| This warning must be followed for your protection and to avoid damage to |
| the equipment being used. |
|
|
WARNING | Adjustments described in this chapter are performed with |
| power applied to the instrument and with protective |
| covers removed. Maintenance should be performed only by |
| trained personnel who are aware of the hazards involved. |
| When the maintenance procedure can be performed |
| without power, the power should be removed. |
|
|