Adjustments
Introduction
Equipment Required
The adjustment procedures include a list of recommended test equipment. The test equipment is also identified on the test setup diagrams.
Post-Repair Adjustments
Table
Table
| Assembly Replaced | Related Adjustments, Performance |
| Tests or Self Tests | |
|
| |
|
|
|
|
|
|
A1 | Power Supply | Self Test. |
|
|
|
A2 | Processor Assembly | Frequency and Level Adjustments, |
|
| Power Reference Level Test, Display |
|
| Brightness and Contrast Adjustment. |
|
|
|
A3 | Front Panel Assembly | Instrument Accuracy Test, Display |
|
| Brightness and Contrast Adjustment. |
|
|
|
A4 | Comms Assembly | All automated Tests and Serial Interface |
|
| Self Test. |
|
|
|
A5 | Daughter Assembly | Instrument Accuracy Test. |
|
| |
A6 Measurement Assembly | Zero Test, Instrument Accuracy Test. | |
|
| |
W1 or W2 Power Sensor | Instrument Accuracy Test, Zero Test. | |
Cable |
| |
|
| |
BT1 Lithium Battery | Battery Self Test. | |
|
| |
Power Reference Cable Kits | Power Reference Level Test. | |
|
|
|
Agilent E4418B/E4419B Service Guide |