Chapter 3 Installing the Cisco XR 12410 Router

Supplemental Bonding and Grounding Connections

Supplemental Bonding and Grounding Connections

Before you connect power to the router, or power on the router for the first time, We recommend that you connect the central office ground system or new equipment building system (NEBS) to the supplemental bonding and grounding points on the router. For more information on supplemental bonding and grounding cable requirements, see the “NEBS Supplemental Unit Bonding and Grounding Guidelines” section on page 2-18.

Use the following procedure to attach a grounding cable lug to the router:

Step 1 Install the locking washers and nuts over the bonding and grounding cable studs and tighten securely (Figure 3-19).

Figure 3-19 Router Rear NEBS Bonding and Grounding Studs

53269

 

Cisco XR 12410 Router Installation Guide

3-26

OL-13832-01

Page 102
Image 102
Cisco Systems XR 12410 manual Supplemental Bonding and Grounding Connections